Map: Exercise 2

The diagrams below show the site of a school in 2004 and the plan for changes to the school site in 2024.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

huong

My name is Huong. I’m an English teacher specializing in IELTS.

More Reading

Post navigation

7 Comments

  • Cô sửa bài giúp e nhé. Body 2 e viết hơi dài cô xem hộ e luôn nhé cô.😍
    Exercise: 2 map
    The diagrams describe the place of a school in 2004 and the plan for changes to the school site in 2024.

    Overall, it is clear that there will be signitificant changes over the given period of 20 years. New facilities including a road, school building 3, and car park 2 will be built by 2024.

    In 2004, there were two school buildings, and a road running from the main entrance to the sport field. However, by 2024 it is expected that the sport field will be relocated to the East of the diagram to make way for a new school building will be constructed at its place. Furthermore, in the future a corridor will be built to connect two former school buildings together, and so the original path will be shorter, link the school buildings only.

    Looking at the diagrams in detail, we can see that by 2024, a new car park will be constructed in the Northeast of diagram, and a new road will be built to link car park 1 with car park 2. No changes will be made to the original car park 1, main entrance, and road in the West. Finally, it is predicted that there will be more students (1000).

    Looking at the diagrams in detail, we can see that by 2024, the trees which in the Northeast are anticipated to be moved to the North, and a new car park will be constructed at the former place of trees. In addition, a new road will be built to link car park 1 with car park 2. No changes will be made to the original car park 1, main entrance, and road in the West. Finally, it is predicted that there will be more students (1000).

  • E sửa lại r á cô.
    Exercise 2: map
    The diagrams describe the place of a school in 2004 and the plan for changes to the school site in 2024.

    Overall, it is clear that there will be signitificant changes over the given period of 20 years. New facilities including a road, school building 3, and car park 2 will be built by 2024.

    In 2004, there were two school buildings, and a road running from the main entrance to the sport field. However, by 2024 it is expected that the sport field will be relocated to the East of the diagram to make way for a new school building will be constructed at its place. Furthermore, in the future a corridor will be built to connect two former school buildings together, and so the original path will be shorter, link the school buildings only.

    Looking at the diagrams in detail, we can see that by 2024, the trees in the Northeast are anticipated to be moved next to the school building 3, and a new car park will be constructed at the former place of trees. In addition, a new road will be built to link car park 1 with car park 2. No changes will be made to the original car park 1, main entrance, and road in the West. Finally, it is predicted that there will be more students (1000).

  • E sửa lại lần nữa nè cô.
    Exercise 2: map
    The diagrams describe the place of a school in 2004 and the plan for changes to the school site in 2024.

    Overall, it is clear that there will be signitificant changes to the school site over the given period of 20 years. New facilities including a road, school building 3, and car park 2 will be built by 2024.

    In 2004, there were two school buildings, and a road running from the main entrance to the sport field. However, by 2024 it is expected that the sport field will be relocated to the East of the diagram to make way for a new school building which will be constructed at its place. Furthermore, in the future, a corridor will be built to connect two former school buildings together, and so the original path will be shorter, link the school buildings only.

    Looking at the diagrams in detail, we can see that by 2024, the trees in the Northeast are anticipated to be moved next to the school building 3, and a new car park will be constructed at the former place of the trees. In addition, a new road will be built to link car park 1 with car park 2. No changes will be made to the original car park 1, main entrance, and road in the West. Finally, it is predicted that there will be more students (1000).

  • E sửa lại thêm 1 lần nữa nè cô.
    Exercise 2: map
    The diagrams describe the place of a school in 2004 and the plan for changes to the school site in 2024.

    Overall, it is clear that there will be signitificant changes to the school site over the given period of 20 years. New facilities including a road, school building 3, and car park 2 will be built by 2024.

    In 2004, there were two school buildings, and a road running from the main entrance to the sport field. However, by 2024 it is expected that the sport field will be relocated to the East of the diagram to make way for a new school building which will be constructed at its place. Furthermore, in the future, a corridor will be built to connect the two original school buildings together, and so the original path will be shorter, link the school buildings only.

    Looking at the diagrams in detail, we can see that by 2024, a new car park will be constructed in the Northwest of diagram, and a new road will be built to link car park 1 with car park 2. No changes will be made to the original car park 1, main entrance, and road in the West. Finally, it is predicted that there will be more students (1000).

  • E sửa lại thêm 1 lần nữa nè cô.

    The diagrams describe the place of a school in 2004 and the plan for changes to the school site in 2024.

    Overall, it is clear that there will be signitificant changes to the school site over the given period of 20 years. New facilities including a road, school building 3, and car park 2 will be built by 2024.

    In 2004, there were two school buildings, and a road running from the main entrance to the sport field. However, by 2024 it is expected that the sport field will be relocated to the East of the diagram to make way for a new school building which will be constructed at its place. Furthermore, in the future, a corridor will be built to connect the two original school buildings together, and so the original path will be shorter, link the school buildings only.

    Looking at the diagrams in detail, we can see that by 2024, a new car park will be constructed in the Northwest of the diagram, and a new road will be built to link car park 1 with car park 2. No changes will be made to the original car park 1, main entrance, and road in the West. Finally, it is predicted that there will be more students (1000).

Trả lời

Email của bạn sẽ không được hiển thị công khai. Các trường bắt buộc được đánh dấu *